JBRconsult

Technical consultancy for claims and arbitration in construction.

project1 project2 project3 project4

JBRconsult

claims

arbitration

experience

UK-flag NL-vlag

CV - J. Brandenburg

jbr

2010-present
2002-2010
2000-2002
1991-2000
1987-1991
1985-1987
1983-1985
1980-1983
1976-1980
1973-1976
1971-1973
1965-1971

JBRconsult, technical consultant
Ballast Nedam Infra, Nieuwegein, commercial manager
Ballast Nedam International, Golden, Canada, skiresort KHMR
Ballast Nedam International, Nieuwegein, commercial affairs Middle East
Ballast Nedam International, Jakarta, Indonesia, region commercial affairs
Ballast Nedam International, Matara, Sri Lanka, University
Ballast Nedam Work preparation, Amstelveen, project preparation
Ballast Nedam International, Guyana, drainage- and irrigation works
Ballast Nedam Engineering, Amstelveen, project design department
L.W. Lievense Consultants, Saldanha, South Afrika, harbourworks
L.W. Lievense Consultants, Breda, project preparation
Study Civil Engineering TU-Delft, Engineer (Ir) in coastal engineering

Recent projects

img9

2014-2015

Solving a conflict between the Main Contractor and Subcontractor concerning duties and entitlements of the Subcontractor at the Public Transport Terminal in Breda.

img8

2009-2014

Arbitration between Owner and Main Civil Contractor of a 100Mw windfarm project in the Northsea concerning failure of grouted connections between the Foundation Pile and Transition Piece caused by faulty Building Regulations.

img7

2010

Technical dispute with the client regarding settlement of adjacent buildings during construction of an underground parking garage in the Netherlands where braced steel sheetpiles were used.

img6

2010

Technical dispute with the client regarding unequal settlement of steel storage tanks in the Netherlands build on soft subsoil resulting in necessary repairs to the tanks.

img5

2008-2010

Claim against the client of different radar stations in UK with regard of non-availability of required construction data ultimately resulting in early termination of the contract.

img4

2008-2009

Arbitration concerning the installation of marine cables for a windpark in the North Sea, where burried cables were left at insufficient depth below original seabed.

img3

2006-2009

Technical dispute in arbitration with the main contractor of a bridge project at the Tagus River in Portugal concerning piledriving for foundations in the riverbed with changing soilconditions.

img2

2003-2006

Re-negotiations with the client with regard to a jetty and breakwater project for the import of LNG in Gujarat, India in order to to delete part of the works from the contract scope due to severe site conditions.

img1

2002-2003

Claim to client concerning numerous changes and disturbance to the scope of works for the construction of civil infrastructure and foundations forming part of a power plant in Mexico.

Contact

JBRconsult
J. (Johan) Brandenburg

Telephone:
+31 (0)6 53772296

E-mail:


Website:
www.jbrconsult.nl

Tuesday 23 Apr 2024 22:16

©2012-JBRconsult, powered by apex